As part of their continuous maintenance plan, Dampier Salt Ltd had planned to replace the existing wet salt dump
bridge approach slabs and main steel deck to improve current operations in the Dampier site.
The Flat Rocks Wind Farm Stage 1 Project consists of the construction and operation of 18 x 4.2 MW Vestas Wind turbines and the related civil and electrical infrastructure.
Hydrological/Hydraulics Study of the 220 hectares site located on Soldiers Settlement Road, Tamworth, NSW 2340, which had been identified for the development of an 80 MW solar farm.
Hydrological/Hydraulics Study of the 470 hectares site located on Back Trundle Road,
Parkes, NSW 2870, which had been identified for the development of a 96 MW solar farm.
MAD3 provided cost estimates and engineering for a constrained 59-lot subdivision, minimizing impact, preserving existing structures, and reducing imported fill requirements to save costs.