Our Client commissioned MAD3 Engineering (formerly McDowall Affleck) to provide a comprehensive
condition survey on their Locomotive Depot across a 6,000 m2 site located in Forrestfield.
Our Client raised concerns over accelerated wear experienced in the slewing bearing
gear on Reclaimer REC42101, likely due to excessive backlash. They attempted to address the issue with the
installation of 4 new pinion gears and requested that MAD3 Engineering (formerly Deacon Engineers) attend the
March 2021 shutdown.
As part of their continuous maintenance plan, Dampier Salt Ltd had planned to replace the existing wet salt dump
bridge approach slabs and main steel deck to improve current operations in the Dampier site.
The Flat Rocks Wind Farm Stage 1 Project consists of the construction and operation of 18 x 4.2 MW Vestas Wind turbines and the related civil and electrical infrastructure.
Hydrological/Hydraulics Study of the 220 hectares site located on Soldiers Settlement Road, Tamworth, NSW 2340, which had been identified for the development of an 80 MW solar farm.
Hydrological/Hydraulics Study of the 470 hectares site located on Back Trundle Road,
Parkes, NSW 2870, which had been identified for the development of a 96 MW solar farm.