Loco Depot Upgrades

Our Client commissioned MAD3 Engineering (formerly McDowall Affleck) to provide a comprehensive condition survey on their Locomotive Depot across a 6,000 m2 site located in Forrestfield.

This project also involved the verification of structural capacity for the installation of 2x new 65-ton cranes and design to strengthen the existing building structure that was built in 1971.

Scope of Work

  • Conduct site survey to provide comprehensive condition report
  • Assessment of the structural capacity of the existing building to support additional load in accordance with AS1418.18
  • Design and documentation of strengthening works.

Project Challenges

  • 45-year-old building, with limited As-Built information available
  • Crane Standards at time of construction superseded
  • Strict constructability requirements for strengthening works
  • Strict requirement to minimize operational downtime
  • Strengthening works to be undertaken in a live operational environment.

How We Managed This

  • During the construction survey we were able to confirm that the As-Built structure was generally in accordance with the Design drawings provided by the client
  • Comparison between previous and current standards allowed a preliminary indication on the outcome of the structural assessment
  • The strengthening design was undertaken minimizing the weight of the structural element, each additional element weighing maximum 140 kg
  • Safety in Design and Safety risk assessment were undertaken in conjunction with Aurizon.

Value Engineering

  • MAD3 Engineering worked with Aurizon to produce a strengthening design that could be implemented with limited downtime and disruptions to the operation of the Depot.
  • MAD3 provided technical assistance during the tender review process to ensure that the contractors were meeting Aurizon’s requirements and providing value for money.

Type of Work:

Structural Engineering

Location:

Forrestfield, Western Australia

Engineering Phase:

Detailed Engineering

Industries:

Infrastructure

Duration:

12 months

Type of
Work:

Structural Engineering

Location:

Forrestfield, Western Australia

Engineering
Phase:

Detailed Engineering

Industries:

Infrastructure

Duration:

12 months