Our projects

Our Client intends to repurpose a 20 m³ vessel and a 35 m³ vessel previously used at a Perth area Pump Station for use on the Burrup Peninsular.

A Tier 1 Miner needed to determine the remaining life of 8x dust transfer vessels designed to AD 2000 Merkblätter.

Our Client required design and drawings to allow manufacture of 12x Duplex filter vessels in accordance with AS1210-2010.

Juceda Investments engaged MAD3 Engineering (formerly McDowall Affleck) to initially prepare a servicing report to support the proposed structure plan for lots 252 at 256 Clifford Street in Maddington.

Our Client’s Caterpillar 6060 / Terex RH340B Hydraulic Shovel experienced cracking in the undercarriage due to the inappropriate welding of attachments to the structure.

MAD3 Engineering is providing assistance to the Future Generation JV site team during the construction stage of the Snowy 2.0 Project.

The Flat Rocks Wind Farm Stage 1 Project consists of the construction and operation of 18 x 4.2 MW Vestas Wind turbines and the related civil and electrical infrastructure.

Port Bouvard Ltd planned to develop the Gidgegannup Townsite to deliver a vision and commitment to creating a sustainable land development, based on sound planning and design principles to drive sustainability for the community.

MAD3 Engineering (formerly McDowall Affleck) assisted the York - Rizzani De Eccher Joint Venture during the design and construction of the Matagarup Bridge.
We deliver comprehensive technical
expertise and proven experience encompassing greenfield and
brownfield projects, along with land
development.
We ensure efficient and cost-effective project execution, delivering results that align with your strategic objectives.
Contact us today to discuss how we can contribute to the results you seek.