Curtin Library Redevelopment

Third party temporary works engineering for the modifications and additions to the TL Robertson Library at Curtin University.

Scope Of Work

  • Third party verification of temporary works including scaffolding, hoardings, lift studies, propping and formwork
  • Site inspections of temporary works
  • Periodic site inspections of site facilities

Project Challenges

  • Quick responses required
  • Limited as-built information available for the existing building

How We Managed This

  • Leveraging our office location close to site and dedicated engineer on the project
  • Site inspections to check the existing structure and confirm accuracy of design assumptions

Value Engineering

  • Timely response of MAD3’s dedicated engineer avoided site delays
  • Practical approach to finding solutions to site issues

Temporary platforms and scaffolding around a university library building.

Type of Work:

Structural Engineering, Temporary Works

Location:

Australia, Perth, Western Australia

Engineering Phase:

Construction Support, Consultancy, Detailed Engineering

Industries:

Infrastructure

Duration:

30 months

Type of
Work:

Structural Engineering, Temporary Works

Location:

Australia, Perth, Western Australia

Engineering
Phase:

Construction Support, Consultancy, Detailed Engineering

Industries:

Infrastructure

Duration:

30 months