Challenge: Design review and verification of a 360m3 Sludge Silo to AS1170-2002 Structural design actions & AS4100-1998 Steel structures.
Services: Design Verification and FE Analysis
Solution: The review found some areas of the silo that did not comply. Deacon Engineers detailed proposed modifications to enable the silo to comply. The review found some areas of the silo that did not comply. Deacon Engineers detailed proposed modifications to enable the silo to comply.