MAD3 was requested to provide design and third party verification of temporary works including belt storage towers and conveyors foundations, tunnel ventilator support frames, TBM temporary support, and pads stability checks.
Scope Of Work
- 3rd party review and certification of:
- belt storage tower foundation
- conveyor foundations
- tunnel ventilators support frames
- TBM temporary support
- Optimization of belt storage tower foundation
- Pads stability check.
Project Challenges
- Quick response time required
- Information required from third parties
- No site inspections allowed due to COVID-19 restrictions.
How We Managed This
- Dedicated engineer on the project
- Proactive approach and good communication with Future Generation contracting site team
- Optimized design to meet conservative design assumptions.
Value Engineering
- Timely response of MAD3’s dedicated engineer to avoid site delays
- Provision of multiple concept options
- Flexible design to include materials available on site and contractor’s preferred installation method.