Juceda Investments engaged MAD3 Engineering (formerly McDowall Affleck) to initially prepare a servicing report to support the proposed structure plan for lots 252 at 256 Clifford Street in Maddington.

The proposed structure plan was to rezone rural residential land to Business Development to accommodate predominantly logistics and distribution warehouses across over 20 ha. We were subsequently engaged to undertake the design and construction inspections of all roads, drainage, retaining walls, on site effluent disposal and water reticulation in accordance with the City of Gosnells’ Planning Scheme 6. MAD3 also undertook internal civil design of the logistics developments.

Scope Of Work

  • Design and documentation of earth works, road works, drainage, water reticulation and onsite effluent disposal.
  • Approval assistance with Government departments.
  • Inspection of critical aspects of all major works.

Project Challenges

The road network was changed after initial planning due to MRWA not allowing existing Clifford St to be left open to full turning movements.

How We Managed This

MAD3 designed a new road parallel to Clifford St to allow for a design that accommodated the RAV4 network to allow for B doubles to access the site to service the logistics developments. Included in the design was a new roundabout that was retrofitted into the existing road network on Bickley Road.

Value Engineering

MAD3 has developed a strong relationship with Juceda Investments through working on previous major projects that allowed for aligned understanding of the high standards expected as well as being able to undertake design and manage changes in a timely manner.

Collage of 4 photos showing project progress from start to finish.

Type of Work:

Civil Engineering, Land Development

Location:

Australia, Perth, Western Australia

Engineering Phase:

Construction Support, Detailed Engineering

Industries:

Infrastructure, Land Development

Duration:

7 years

Type of
Work:

Civil Engineering, Land Development