MAD3 was requested to provide design and/or independent verification of temporary works including Mechanically Stabilised Earths (MSE) and in-situ concrete walls propping, jacks supports, temporary beams supports and temporary handrails.
Scope Of Work
- Design of MSE walls temporary propping and anchoring blocks
- Independent verification of in-situ walls propping
- Review and certification of jacks support, temporary beam supports and temporary handrails.
Project Challenges
- Quick response time required
- Optimisation required due to limited availability of materials
- Information required from third parties.
How We Managed This
- Dedicated engineer on the project
- Parametric design independently verified within the MAD3 team to optimise the design via automated process
- Proactive and good communication with LWA site team.
Value Engineering
- Timely response of MAD3 Engineering’s dedicated engineer to avoid site delays
- Provision of multiple concept options
- Flexible design to include materials available on site and contractor’s preferred installation method