MAD3 Engineering was requested to provide design and third-party verification of temporary works including lifting beams, void formers, A-truck frame, prefabricated reinforcement lifting and propping, formwork propping and foundations, temporary restraint system for steel decks during installation.
Project Challenges
- Quick response time required
- Information required from third parties
- No site inspections allowed due to COVID-19 restrictions.
How We Managed This
- Dedicated engineer on the project
- Proactive approach and good communication with NRW Contracting site team
- Optimised design to meet conservative design assumptions.