MAD3 Engineering (formerly McDowall Affleck) assisted the NRW Contracting site team during the construction stage of the Eliwana Project Bridges.

MAD3 Engineering was requested to provide design and third-party verification of temporary works including lifting beams, void formers, A-truck frame, prefabricated reinforcement lifting and propping, formwork propping and foundations, temporary restraint system for steel decks during installation. 

Project Challenges  

  • Quick response time required 
  • Information required from third parties 
  • No site inspections allowed due to COVID-19 restrictions. 

How We Managed This  

  • Dedicated engineer on the project 
  • Proactive approach and good communication with NRW Contracting site team 
  • Optimised design to meet conservative design assumptions.  

Type of Work:

Structural Engineering

Location:

Australia, Tom Price, Western Australia

Engineering Phase:

Construction Support

Industries:

Temporary Works

Duration:

8 months